Accueil > Actualité > Société

Suez: ORC installation contract with Enertime

(CercleFinance.com) - Enertime, a French CleanTech company specializing in industrial energy efficiency and the production of geothermal and biomass energy, announces that it has signed a 3.
8 ME contract with SUEZ for the installation of a 1.7 MWe ORC.

This installation is designed to generate electricity by recovering the heat produced by the Carrières-sur-Seine waste-to-energy plant during periods when this heat is not used in the district heating network.

An ORC can recover the heat contained in the fumes from incineration furnaces and convert it into electricity. To do this, a heat exchanger is installed on the flue gas.

Commissioning of the machine is scheduled for April 2025.

Copyright (c) 2023 CercleFinance.com. All rights reserved.
 

societes

marches

tendances

Sondage

A quel niveau sera le CAC40 à fin Mai 2024:

En hausse à 8620Pts
En hausse à 8450Pts
Stable sur le niveau des 8200Pts
En baisse à 7750Pts
En baisse à 7430Pts
Qui sommes-nous ? | Nous contacter | FAQ | Mentions légales | RSS | © Copyright 2007 Cercle Finance. Tous droits réservés.